Subject of delivery:
At the start of the 2021 school year, EUROPANEL completed the construction of a medical center in Seifhennersdorf, Germany. The medical center was built using the LightBuilding system, meaning that the entire structure is supported by ground screws without the need for concrete foundations, with Europanels EP 270 also serving as the foundation slab.
At the start of the 2021 school year, EUROPANEL completed the construction of a medical center in Seifhennersdorf, Germany. The medical center was built using the LightBuilding system, meaning that the entire structure is supported by ground screws without the need for concrete foundations, with Europanels EP 270 also serving as the foundation slab.
Thanks to this technology, we completed the entire structural work on the medical center within one month. The project also included the installation of a Europanel Air heat recovery system, which ensures adequate air exchange and thus maintains indoor air quality throughout the medical center.
German television station MDR aired a report on the construction of the center, from which we have prepared a short preview of the work done so far:
Take a look at the gallery documenting the progress so far, and perhaps find inspiration for a similar project: