Subject of delivery:
The client requested the construction of a two-story addition to the existing building, including the installation of a ceiling while preserving the original structure and supporting wooden frameworks. Thanks to the flexibility of the EUROPANEL® system, it was possible to complete the addition despite the asymmetry of the original building. Most of the panels were cut to size on-site as needed to ensure that the final addition was symmetrical. EP170 panels were used for the exterior walls, and the ceiling structure was constructed using EP210 panels.
The client requested the construction of a two-story addition to the existing building, including the installation of a ceiling while preserving the original structure and supporting wooden frameworks. Thanks to the flexibility of the EUROPANEL® system, it was possible to complete the addition despite the asymmetry of the original building. Most of the panels were cut to size on-site as needed to ensure that the final addition was symmetrical. EP170 panels were used for the exterior walls, and the ceiling structure was constructed using EP210 panels.
Completion: August–September 2023
Location: Koberovy